AL RASHEED POWER PLANT

Project Summary


Client: PEW


- Support in project Management and Control Activities.
- Design review of Civil and Electro-Mechanical Engineering, Fuel and Water Storage Tanks
- Supervision of Civil Construction Works Activities and Engineering of Exhaust Stack.
- Procurement of Raw Materials for Steel Structures, sun shed and equipment enclosures, Raw Materials for Fuel and Water Storage Tanks, Pipes and Fittings of different types and sizes, Exhaust Stacks Raw Materials.
- Fabrication of Fuel and Water Storage Tanks, Exhaust Stack System (insulation material, supporting structure, stack shell.
- Erection and Commissioning of Fuel and Water Storage Tanks including painting supply and application, Exhaust Stack including painting supply and application, Steel Structures, sun sheds and equipment enclosures including painting supply and application.
- Method Statement and Supervision for Installation of GT's and Generators on foundation.
- Electro-Mechanical Installations and Commissioning support (2 No. SIEMENS – SGT800 and Bop) and 400KV Switchyard Equipment &400KV Bus-Bar
- Modification on Fuel Manifolds of 2 no. SIEMENS – SGT800.

Status of Progress = 100%
(2009-2010).