TAZA PROJECT, GAS TURBINE POWER PLANT
Project Summary
Client: HEC & PEW.
- Civil Construction (Equipment Foundation, Road and Fence Construction, Trench, Service Building and Industrial Buildings, Gantry Tower and Switchyard Equipment and Gantry Tower, Transmission Line Foundations). - Installation of Main Equipment GTG with Associated Auxiliary Equipment (On Base & Off Base Equipment). - Installation of BOP Equipment (Water Treatment, Fuel Treatment, Gas Station, Forwarding Skid, Unloading Station, Main and Auxiliaries Transformers, Control and Power Substation , Pipes and Cables .............. etc.) - Installation of Switchyard Gantry Tower and Equipment 400kv (CB, DCS, EDCS, SA, CVT, CT, PT...Etc.) - Installation and Setting of Control and Protection Panel for Switchyard 400KV Equipment. - Installation of Fuel and Water Storage Tanks. - Test and Inspection of whole system. - Commissioning and start up activities. Status of Progress = 100% (February 2012 - December 2013). One year warranty (Completed at 24-12-2014).